However, beware that mistakes aren't made even now. I cannot impress on you too much that the buck stops with you and you need to know your plan and specifications inside and out. Dream it if necessary and even then you might not pick up on mistakes the first time they are visible.Case in point: on seeing the plumbing for my ensuite I commented that it was going to be impossible for the recessed bathroom cabinet to be installed if the blumbing ran behind it. Oops! Plumber had to come back and put a dog-leg in the piping but the recessed cabinet was going to give more grief in the future (more on that in a future post).
Notice that the window sills and frames are now in, the insulation is in the roof and exterior walls. Cavity sliders are useful but complicated things which take time to install and paint.
You will have a detailed walk-through with your electrician. There will already be a basic plan submitted to the Council for the building consent but it will not have been your choice. You should have already submitted a plan though to your builder for costing because electricians are a cost that is not fixed. Danger! I used a building plan and colour coded every place I needed power points, TV and internet connections, downlights, chandeliers, outdoor lighting.
I hate houses with ceilings full of downlights. Most new homes are like this. I feel assaulted by a wall of light. There's no atmosphere or 'feel'. Lighting should be functional but also emotional so I've got only the basics of downlights in purely functional areas but French-style chandeliers everywhere else. They were an expense not covered by the lighting PC amounts and the cost wasn't insignificant, though I saved on downlight costs. My ceilings will also not be full of holes, more tranquil.
Please do consider outdoor lighting requirements for the future before they pour your slab or at the least NOW. I needed to be certain that cabling would be available under my patios, before they were poured so conduit holes had to be made in my slab and then through the cladding. Even then, the builder made mistakes and blocked up two feeds. Fortunately the electrician was able to find a work-around.
You can't take anything for granted. It's YOUR house and the number of mistakes that can be made increases. Next post - the interior fitout which means gibbing and painting etc.